Projects
Safety Performance
During the last five (5) year period (FY16 to FY20) Mallard Contracting has only reported a single recordable injury, which was manual handling related. This event resulted in a continual improvement solution related to mechanical aids used for our work tasks under buildings.
This exemplary safety performance recorded by Mallard Contracting to date is as a result of our focus on field leadership activities and leading KPI measures. These measures include behavioural safety interactions, workplace inspections and system audits. Challenging KPI targets have been established for each leadership role within the business, including those of our supply chain (subcontractors) and are tracked to ensure we achieve the required safety performance as a contractor. Our workforce is similarly engaged with KPI measures established for hazard observations and safety observations (peer-on-peer) and an understanding that everyone has an authority to ‘Stop Work’ if they believe anything is unsafe and to speak up and address at-risk behaviours with their peers if observed.
Whilst our safety management system is yet to be third party accredited to the current ISO standard for 45001 it is mapped against the elements of this document and provides a robust framework to support the identification and management of risks specific to our scope of operations, whilst ensuring compliance to applicable legal obligations and other relevant requirements.
Recent Projects
Namuldi Waste Water Treatment Plant
Rio Tinto
Pilbara
Design and construct a centralised Waste Water Treatment Plant (WWTP) for Namuldi operations. Decommissioning of two existing 40 Foot WWTP sea containers known as Namuldi Below Water Table (NBWT) Administration WWTP and Operation WWTP and all associated infrastructure, including the spray fields in compliance with Australian Standards, Rio Tinto standards and relevant regulatory requirements.
Birra Birra A & B Camp Relocation
Client
Jacobs/Rio Tinto
Pilbara
- Removal & Relocation of Central facility Buildings – Gym, dry mess wet mess and Kitchen and dining
- Removal and Relocation of 220 accommodation SPQ’s
- Greenfield Civil works
- Reinstallation of the above at Koodaideri
Cape Lambert Substation 3A Civil Package
Rio Tinto
Pilbara
- Excavation and Civil works
- Formwork
- Concrete
- Conduit Installation
- Earth grid installation
MEM Project – Drain HV Wash Bay Civil works
Rio Tinto
Pilbara
- Removal and Replacement of Concrete Apron
- Civil works
- Concrete and Drainage Works.
- MEM Workshop apron slabs.
- MEM Drainage with Steel Grating.
- Heavy Vehicle Wash Down Bay Upgrade
Baynton West Primary School
Fleetwood
Karratha
- Earthworks & Siteworks
- Electrical Services
- Drainage & Plumbing
- Mechanical Services and Carpentry
- Roofing & Stormwater
- Structural Steel
- Joinery & Cabinet work
- Hardware and Concreting
- Metal work
- Painting
- Floor coverings
- Glasswork
- Landscaping & Irrigation
- Demolition and Transport
- Supply of Furniture & Whitegoods
- Cleaning
Design, Construction and Installation of Eliwana
Eliwana
Pilbara
A major contract win for Mallard Deemey, a jointly owned and operated Company of Puutu Kunti Kurrama and Pinikura (PKKP) member, Donna Meyer and Mallard Contracting Pty Ltd owner, Robby Mallard.
Work entails the design, construction and installation of the Aerodrome, Laboratory, Ammonium Nitrate Fuel / Oil Facility and administrative facilities.
Deconstruction of Wheatstone Camp for relocation to Eliwana
Eliwana
Pilbara
Consists of 500, four room accommodation units (total of 2000 beds) and supporting central facilities such as kitchen, gymnasium, wet mess and associated equipment to be decomplex and packed ready for transport.
Supply, installation and testing of the civil, structural concrete, conduit and electrical earthing works
Cape Lambert
Pilbara
Main works included bulk and detailed earthworks, concrete foundations, platforms, staircases and cable supports earth grid for a new switch-room.
Refurbishment of 300 rooms at West Pilbara Village Brockman
SODEXO/Rio Tinto
Pilbara
Refurbishment of 300 Rooms at the Brockman Village which included painting, electrical testing, air-conditioning recons and replacement.
Camp Establishment
Hastings Technologies
Pilbara
Deliver and install the fly camp and stage one of the permanent Yangibana camp. This included all preliminaries, Underground Services, Transportation of buildings from Perth, Landing of the Buildings, Complexing, and connecting electrical and hydraulic works.
Refurbishment of 23 Dwellings at Wakathuni and Youngaleena Community
Pilbara
- Site Works and External Works
- Concrete
- Wall & Roof Structures
- Roof Lining
- External & Internal Linings and Soffit Linings
- Insulation
- Joinery & 2ND Fix
- Cabinet Work
- Floor and Wall Finishes Aluminum Windows & Glazing
- Security Screens
- Painting
- Plumbing and Electrical
- Mechanical
- Fencing
Christmas Creek
FMG
Pilbara
- Installation of precast footings
- Earthworks and Final Trim
- Installation of OPF Switchroom
- Structural grouting
Mosman Park Primary School
BMW/Fleetwoods
Perth
- Earthworks and Site Works
- Mechanical Services
- Carpentry
- Stormwater and Roofing
- Joinery and Cabinet Work
- Painting and Floor Coverings
- Demolition
- Remove and reinstate fence
Do you have an upcoming civil construction project?
Contact the expert team at Mallard Contracting to assist you with your estimating and project delivery requirements.